Uploaded January 2019 | Updated September 2026, 3 days ago
Welcome back, Soledad! One of the highest Power Grid winrates you'll see on BSW, and you can see why right here.
Soledad had a great start with the classic triple-Paris build followed by Plant 11 for a little cheaper than normal. That was because 27 was showing in the market and i thought i could get it after Ryan bought a plant. Unfortunately 19 put the kibosh on that plan, though i did get a 15 drop out of nowhere as a consolation prize.
The real key turn was nor too long after, when the 20 became available. Soledad & i bid for it, and he let it go for not much above its starting price. 29 was on deck, but there were enough duds left that i thought 20 was worth a little bidding. Unfortunately 29 came, and Soledad just never let go of the money lead from there. He kept overbuilding during Step 2 as well, which was necessary to move the market after it stalled for a while. Having paid close to $45 for the 26, i was not pleased at that!
Step 3 arrived way too early for the rest of us, we couldn't build to more than 14, and Soledad ended it at 14 capacity for the easy win.
If you'd like to learn more about Power Grid, please check my blog for strategy articles on each power plant as well as a guide to 2-player games:
maninmotiongoingnowhere.wordpress.com/power-grid-strategy-individual-plant-articles
Welcome back, Soledad! One of the highest Power Grid winrates you'll see on BSW, and you can see why right here.
Soledad had a great start with the classic triple-Paris build followed by Plant 11 for a little cheaper than normal. That was because 27 was showing in the market and i thought i could get it after Ryan bought a plant. Unfortunately 19 put the kibosh on that plan, though i did get a 15 drop out of nowhere as a consolation prize.
The real key turn was nor too long after, when the 20 became available. Soledad & i bid for it, and he let it go for not much above its starting price. 29 was on deck, but there were enough duds left that i thought 20 was worth a little bidding. Unfortunately 29 came, and Soledad just never let go of the money lead from there. He kept overbuilding during Step 2 as well, which was necessary to move the market after it stalled for a while. Having paid close to $45 for the 26, i was not pleased at that!
Step 3 arrived way too early for the rest of us, we couldn't build to more than 14, and Soledad ended it at 14 capacity for the easy win.
If you'd like to learn more about Power Grid, please check my blog for strategy articles on each power plant as well as a guide to 2-player games:
maninmotiongoingnowhere.wordpress.com/power-grid-strategy-individual-plant-articles










