Investigation Results Inside Unit 3 Main Steam Isolation Valve Room at Fukushima @hilbert00
Investigation Results Inside Unit 3 Main Steam Isolation Valve Room at Fukushima  @hilbert00
Uploaded May 2014 | Updated November 2026, 3 hours ago
Original video from TEPCO photo.tepco.co.jp/en/date/2014/201405-e/140515-01e.html
Investigation Results Inside Unit 3 Main Steam Isolation Valve Room at FukushimaMonitoring radiation at Fukushima Daiichi JP (2/2)Water sampling from reactor 1 PCV at Fukushima Daiichi (3/3)Visual inspection inside reactor 2 PCV (part 1 of 4)After wiping work of rails for the equipment hatch, the Pressure Containment Vesselthe back of Unit 5 (Primary Containment Vessel) air conditioner 5-30AFuel handling machine (part 1)Removing fresh fuel from Pool 4 at Fukushima (part 3 of 4)cable tray in the south side of Unit 5 high pressure condensed water pump (C)Greeting when visiting Fukushima Daini NPP (2/2)in front of Unit 3,4 S/B underground floor cable bolt room (part 3 of 3)TEPCO president visiting the stabilization center
Antonio Bulgheroni (toto) |

Investigation Results Inside Unit 3 Main Steam Isolation Valve Room at Fukushima

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER