Fuel handling machine (part 1) @hilbert00
Fuel handling machine (part 1)  @hilbert00
Uploaded April 2012 | Updated November 2026, 3 hours ago
Inside the spent fuel pool of reactor number 3 in Fukushima Daiichi
Fuel handling machine (part 1)Removing fresh fuel from Pool 4 at Fukushima (part 3 of 4)cable tray in the south side of Unit 5 high pressure condensed water pump (C)Greeting when visiting Fukushima Daini NPP (2/2)in front of Unit 3,4 S/B underground floor cable bolt room (part 3 of 3)TEPCO president visiting the stabilization centerInside PCV 2: Camera in the pipe guideNuclear Fuel Assembly removal from the SFP 4 at FukushimaInvestigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power StationUnit 6 access way between switchgear and T/Bunderground water inflow at Unit 6 RW trench (part 5 of 7)Discussion at the Fukushima Daiichi NPP
Antonio Bulgheroni (toto) |

Fuel handling machine (part 1)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER