Visual inspection inside reactor 2 PCV (part 1 of 4) @hilbert00
Visual inspection inside reactor 2 PCV (part 1 of 4)  @hilbert00
Uploaded January 2012 | Updated November 2026, 3 hours ago
On Jan 19, 2012 TEPCO, the operator of the crippled Fukushima Daiichi Nuclear Power Plant, made the first visual inspection inside the primary containment vessel of reactor number 2 using and industrial endoscope.

Pictures and comments (in italian) here:
unico-lab.blogspot.com/2012/01/prime-immagini-da-dentro-il-reattore-2.html


Part 1 of 4: youtu.be/8zoMJM9hr3w
Part 2 of 4: youtu.be/PyT-pAwrpnw
Part 3 of 4: youtu.be/css4IxW3NjA
Part 4 of 4: youtu.be/hEKqAo2aLGw
Visual inspection inside reactor 2 PCV (part 1 of 4)After wiping work of rails for the equipment hatch, the Pressure Containment Vesselthe back of Unit 5 (Primary Containment Vessel) air conditioner 5-30AFuel handling machine (part 1)Removing fresh fuel from Pool 4 at Fukushima (part 3 of 4)cable tray in the south side of Unit 5 high pressure condensed water pump (C)Greeting when visiting Fukushima Daini NPP (2/2)in front of Unit 3,4 S/B underground floor cable bolt room (part 3 of 3)TEPCO president visiting the stabilization centerInside PCV 2: Camera in the pipe guideNuclear Fuel Assembly removal from the SFP 4 at FukushimaInvestigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
Antonio Bulgheroni (toto) |

Visual inspection inside reactor 2 PCV (part 1 of 4)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER