After wiping work of rails for the equipment hatch, the Pressure Containment Vessel @hilbert00
After wiping work of rails for the equipment hatch, the Pressure Containment Vessel  @hilbert00
Uploaded November 2011 | Updated November 2026, 3 hours ago
TEPCO official video showing the status of the rails after automatic robot cleaning operations.

Document: tepco.co.jp/en/nu/fukushima-np/images/handouts_111122_02-e.pdf
After wiping work of rails for the equipment hatch, the Pressure Containment Vesselthe back of Unit 5 (Primary Containment Vessel) air conditioner 5-30AFuel handling machine (part 1)Removing fresh fuel from Pool 4 at Fukushima (part 3 of 4)cable tray in the south side of Unit 5 high pressure condensed water pump (C)Greeting when visiting Fukushima Daini NPP (2/2)in front of Unit 3,4 S/B underground floor cable bolt room (part 3 of 3)TEPCO president visiting the stabilization centerInside PCV 2: Camera in the pipe guideNuclear Fuel Assembly removal from the SFP 4 at FukushimaInvestigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power StationUnit 6 access way between switchgear and T/B
Antonio Bulgheroni (toto) |

After wiping work of rails for the equipment hatch, the Pressure Containment Vessel

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER