Water sampling from reactor 1 PCV at Fukushima Daiichi (3/3) @hilbert00
Water sampling from reactor 1 PCV at Fukushima Daiichi (3/3)  @hilbert00
Uploaded October 2012 | Updated November 2026, 20 hours ago
Water sampling from reactor 1 PCV at Fukushima Daiichi (3/3)Visual inspection inside reactor 2 PCV (part 1 of 4)After wiping work of rails for the equipment hatch, the Pressure Containment Vesselthe back of Unit 5 (Primary Containment Vessel) air conditioner 5-30AFuel handling machine (part 1)Removing fresh fuel from Pool 4 at Fukushima (part 3 of 4)cable tray in the south side of Unit 5 high pressure condensed water pump (C)Greeting when visiting Fukushima Daini NPP (2/2)in front of Unit 3,4 S/B underground floor cable bolt room (part 3 of 3)TEPCO president visiting the stabilization centerInside PCV 2: Camera in the pipe guideNuclear Fuel Assembly removal from the SFP 4 at Fukushima
Antonio Bulgheroni (toto) |

Water sampling from reactor 1 PCV at Fukushima Daiichi (3/3)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER