Turntable Part 9 - Wheels Under the Bridge @ToyManTelevision
Turntable Part 9 - Wheels Under the Bridge  @ToyManTelevision
Uploaded December 2025 | Updated September 2026, 2 weeks ago
The most complicated engineering in the turntable project, the wheels that ride on the ring rail and set the level of the bridge.

This has been a difficult bit of design. On a prototype turntable the wheels =at the end of the bridge support all the weight of the locomotives and have the motors that drive the turntable bridge.

On our model the drive is on a shaft in the center of the bridge and most of the weight is supported in the center. AND, Ive never been sure that would work, especially with the heavy brass locomotives.

So its not just a project, it's test of a concept...

#modelraillayout #gardenrailroad #gscale
Turntable Part 9 - Wheels Under the BridgeCheck it OUT! Using tiny squeeze bottles to apply CA glue to the Coaling Tower laddersThe Future of Rail Transportation? Over 1741 Miles (2801 Km) on a Single Fill of Hydrogen!Part 13 Tracks to the RoundhouseInside The Most AMAZING Model Train Exhibition of 2025!Sidewalks and a Bathroom on the Garden Railroad - Reworking the Village of GrapevineWatch our Garden Railroad Christmas Village Come to Life!Turntable Part 8 - Color and Ring RailBuilding The Worlds Most Detailed Model Train Track From Scratch!Are the BEST Paint Jobs Done with Lacquer Paint?  Airbrushing Lacquer PaintsThe Easy Way to Replace a Broken Drive Gear on Bachmanns Large-Scale Spectrum Outside Frame 2-8-0Beautiful Garden Railroad! Its SPRING! Lets revisit a great garden railroad
Toy Man Television |

Turntable Part 9 - Wheels Under the Bridge

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER