The Mystery Project - Part 11,  2nd roller done, some transmission parts @dynoguy
The Mystery Project - Part 11,  2nd roller done, some transmission parts  @dynoguy
Uploaded March 2018 | Updated September 2026, 3 weeks ago
This is the 11th episode of a (currently) unrevealed mystery project. i am pretty sure that at some point, someone else comes along with the right guess.
(Youtuber "Rolingmetal" already guessed it right...:)
If you got an idea, please send me a message with your guess, so we can keep the mystery for a little bit longer.
If you got the right idea, your name goes to the list.

Please also watch the other parts, the project playlist is here
youtube.com/playlist?list=PLJ5sckhk3ninWKp5_LuLqT90IH8TIbbHf

Please subscribe, it really helps to grow this channel as Youtube recently made life much harder for small channels like this.

This is a rather large project and this video series will just follow along the progress as it happens, obviously interrupted by other things with higher priority.
Due to it's complexity and the number of parts required, we would probably use any machine in the shop at least once.
On top of the mechanical bits there is also a fair bit of electrics/electronics and pipework/hydraulics to come with it.
All conceptual decisions are made and rough sketches are on paper, but availability of (cheap/free) materials and parts may lead to alterations, because the whole project runs on a shoestring budget by decision.
On a $50k budget anyone can build or even buy something like that off the shelf, but i want to spend much, much less than this, well see how the bill looks like at the end ...:-)

In this part we make the second roller and test fit some transmission parts, also a preview of the next parts to machine.

Next part should not take too long to come as time is running, but as usual, other project getting in the way, so the next video might be something else.

Bearings and tooth belts and taper bushes supplied by bearingboys.co.uk , i have no connection to them whatsoever, just a happy customer.

(c) 2018
dynoguy.co.uk
The Mystery Project - Part 11,  2nd roller done, some transmission partsJeep Radiator mods to make it fit + electric fan conversion details, Cherokee XJ 4.0KitchenAid Stand Mixer repair - Part 2, re-assembly and mixing the Sunday cake (Model 5KPM5)Volvo V50 Front Suspension - Ep#2, wishbones (front lower control arms) replacementElliott 14S Shaper - Motor refurbishment part 1, tear down, inspection and brief checksKearns S-Type Horizontal Boring Mill, Part2 - moving it into the shopJeep Distributor Change Procedure,  4.0 ltr ERH engine, Cherokee XJJeep Track Rod replacement trouble , part 2 - Success !Flea Market + Auction Scores #3.2 - local tool auction 02/2018, part 2Auction Bargains 11.20 - Steel, Aluminium, etc, pipe fittings, electrical bits + bobsWashing Machine Motor,  Speed encoder fix (magnet ring falling off)Jeep Water Pump and Thermostat change - Part 2, re-assembly and test (Cherokee XJ)
dynoguy |

The Mystery Project - Part 11, 2nd roller done, some transmission parts

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER