Uploaded March 2018 | Updated September 2026, 3 weeks ago
This is the 11th episode of a (currently) unrevealed mystery project. i am pretty sure that at some point, someone else comes along with the right guess.
(Youtuber "Rolingmetal" already guessed it right...:)
If you got an idea, please send me a message with your guess, so we can keep the mystery for a little bit longer.
If you got the right idea, your name goes to the list.
Please also watch the other parts, the project playlist is here
youtube.com/playlist?list=PLJ5sckhk3ninWKp5_LuLqT90IH8TIbbHf
Please subscribe, it really helps to grow this channel as Youtube recently made life much harder for small channels like this.
This is a rather large project and this video series will just follow along the progress as it happens, obviously interrupted by other things with higher priority.
Due to it's complexity and the number of parts required, we would probably use any machine in the shop at least once.
On top of the mechanical bits there is also a fair bit of electrics/electronics and pipework/hydraulics to come with it.
All conceptual decisions are made and rough sketches are on paper, but availability of (cheap/free) materials and parts may lead to alterations, because the whole project runs on a shoestring budget by decision.
On a $50k budget anyone can build or even buy something like that off the shelf, but i want to spend much, much less than this, well see how the bill looks like at the end ...:-)
In this part we make the second roller and test fit some transmission parts, also a preview of the next parts to machine.
Next part should not take too long to come as time is running, but as usual, other project getting in the way, so the next video might be something else.
Bearings and tooth belts and taper bushes supplied by bearingboys.co.uk , i have no connection to them whatsoever, just a happy customer.
(c) 2018
dynoguy.co.uk
This is the 11th episode of a (currently) unrevealed mystery project. i am pretty sure that at some point, someone else comes along with the right guess.
(Youtuber "Rolingmetal" already guessed it right...:)
If you got an idea, please send me a message with your guess, so we can keep the mystery for a little bit longer.
If you got the right idea, your name goes to the list.
Please also watch the other parts, the project playlist is here
youtube.com/playlist?list=PLJ5sckhk3ninWKp5_LuLqT90IH8TIbbHf
Please subscribe, it really helps to grow this channel as Youtube recently made life much harder for small channels like this.
This is a rather large project and this video series will just follow along the progress as it happens, obviously interrupted by other things with higher priority.
Due to it's complexity and the number of parts required, we would probably use any machine in the shop at least once.
On top of the mechanical bits there is also a fair bit of electrics/electronics and pipework/hydraulics to come with it.
All conceptual decisions are made and rough sketches are on paper, but availability of (cheap/free) materials and parts may lead to alterations, because the whole project runs on a shoestring budget by decision.
On a $50k budget anyone can build or even buy something like that off the shelf, but i want to spend much, much less than this, well see how the bill looks like at the end ...:-)
In this part we make the second roller and test fit some transmission parts, also a preview of the next parts to machine.
Next part should not take too long to come as time is running, but as usual, other project getting in the way, so the next video might be something else.
Bearings and tooth belts and taper bushes supplied by bearingboys.co.uk , i have no connection to them whatsoever, just a happy customer.
(c) 2018
dynoguy.co.uk










