Uploaded July 2025 | Updated September 2026, 2 hours ago
All 195 elevated segments of Melbourneās future 2.5km veloway are installed and works are progressing with anti-slip coating, overhead steel mesh and CCTV, lighting and electrical systems.
This dedicated elevated cycling path is set to transform the way you ride later this year ā offering a safer, smoother journey above Footscray Road, connecting the west with Melbourne CBD and beyond.
š Check out this sneak peek and explore how this exciting new link will make your ride better than ever with the animated route map.
All 195 elevated segments of Melbourneās future 2.5km veloway are installed and works are progressing with anti-slip coating, overhead steel mesh and CCTV, lighting and electrical systems.
This dedicated elevated cycling path is set to transform the way you ride later this year ā offering a safer, smoother journey above Footscray Road, connecting the west with Melbourne CBD and beyond.
š Check out this sneak peek and explore how this exciting new link will make your ride better than ever with the animated route map.










