Second inspection in PCV R2 (part 6 of 7) @hilbert00
Second inspection in PCV R2 (part 6 of 7)  @hilbert00
Uploaded March 2012 | Updated November 2026, 1 hour ago
Fukushima Nuclear Accident

Second inspection with a boroscope + thermocouple + ionization chamber inside the primary containment vessel of reactor 2.

Part 1: youtu.be/-eGbkDy5428
Part 2: youtu.be/yTBSmW6Z4wc
Part 3: youtu.be/EU4SIbQx35k
Part 4: youtu.be/vtQ2bT3W7ps
Part 5: youtu.be/cwytRus1KTM
Part 6: youtu.be/n6GgzV982Ss
Part 7: youtu.be/SNVF0Ex4vHo
Second inspection in PCV R2 (part 6 of 7)Images from the bottom part of reactor 1 PCV at Fukushima DaiichiEmergency Drill at Fukushima NPPInvestigation of the Lower Part of Unit 2 Vent Pipe (digest)Nuclear fuel handling in Fukushima DainiEstimation of new emissions (2/2)after alarm of leakage of trench rubber boots of high pressure CSS diesel generator room (3/3)Around the manhole the northeast side in the torus room (on the catwalk)status of underground water inflow at path-through slot of Unit 5 CS (B) pump roomLower part of northeast side in the torus room (inspection of the water surface)Lining of the fuel pool in reactor 4Inspection in the basement of reactor 3
Antonio Bulgheroni (toto) |

Second inspection in PCV R2 (part 6 of 7)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER