after alarm of leakage of trench rubber boots of high pressure CSS diesel generator room (3/3) @hilbert00
after alarm of leakage of trench rubber boots of high pressure CSS diesel generator room (3/3)  @hilbert00
Uploaded November 2011 | Updated November 2026, 1 hour ago
TEPCO Official video

September 3, 2011
after alarm of leakage of trench rubber boots of high pressure CSS diesel generator room (3/3)Around the manhole the northeast side in the torus room (on the catwalk)status of underground water inflow at path-through slot of Unit 5 CS (B) pump roomLower part of northeast side in the torus room (inspection of the water surface)Lining of the fuel pool in reactor 4Inspection in the basement of reactor 3Measuring new emissions from reactors JP (1/2)Fuel rack (part 2)Julia and Valery weddingExploring Fukushima reactor 2 (part 4 of 6)Investigation with a baloon inside reactor 1 at FukushimaRemoving spent fuel from Fukushima pool number 4
Antonio Bulgheroni (toto) |

after alarm of leakage of trench rubber boots of high pressure CSS diesel generator room (3/3)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER