Investigation of the Lower Part of Unit 2 Vent Pipe (digest) @hilbert00
Investigation of the Lower Part of Unit 2 Vent Pipe (digest)  @hilbert00
Uploaded March 2013 | Updated November 2026, 1 hour ago
This is the second of eight connections from the dry-well to the wet-well being checked for water leaks. No water in this one as well.

Original video by TEPCO available tepco.webcdn.stream.ne.jp/www11/tepco/download/130305_01j.zip
Investigation of the Lower Part of Unit 2 Vent Pipe (digest)Nuclear fuel handling in Fukushima DainiEstimation of new emissions (2/2)after alarm of leakage of trench rubber boots of high pressure CSS diesel generator room (3/3)Around the manhole the northeast side in the torus room (on the catwalk)status of underground water inflow at path-through slot of Unit 5 CS (B) pump roomLower part of northeast side in the torus room (inspection of the water surface)Lining of the fuel pool in reactor 4Inspection in the basement of reactor 3Measuring new emissions from reactors JP (1/2)Fuel rack (part 2)Julia and Valery wedding
Antonio Bulgheroni (toto) |

Investigation of the Lower Part of Unit 2 Vent Pipe (digest)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER