Images from the bottom part of reactor 1 PCV at Fukushima Daiichi @hilbert00
Images from the bottom part of reactor 1 PCV at Fukushima Daiichi  @hilbert00
Uploaded October 2012 | Updated November 2026, 20 hours ago
Video taken from inside the primary containment vessel of the reactor number 1 of Fukushima.
Images from the bottom part of reactor 1 PCV at Fukushima DaiichiEmergency Drill at Fukushima NPPInvestigation of the Lower Part of Unit 2 Vent Pipe (digest)Nuclear fuel handling in Fukushima DainiEstimation of new emissions (2/2)after alarm of leakage of trench rubber boots of high pressure CSS diesel generator room (3/3)Around the manhole the northeast side in the torus room (on the catwalk)status of underground water inflow at path-through slot of Unit 5 CS (B) pump roomLower part of northeast side in the torus room (inspection of the water surface)Lining of the fuel pool in reactor 4Inspection in the basement of reactor 3Measuring new emissions from reactors JP (1/2)
Antonio Bulgheroni (toto) |

Images from the bottom part of reactor 1 PCV at Fukushima Daiichi

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER