Responsable de Obra, Melchor Mascaró, España – Why ULMA [es] @Ulmaconstruction
Responsable de Obra, Melchor Mascaró, España – Why ULMA [es]  @Ulmaconstruction
Uploaded October 2025 | Updated September 2026, 2 weeks ago
WHY ULMA: Bartolomé Miralles – Responsable de Obra Melchor Mascaró, España

"Hemos elegido ULMA, es una empresa referente, además de la relación de años que tiene con Melchor Mascaró y, para un proyecto de esta envergadura, se necesita una empresa confiable que te pueda dar la solución a este tipo de estructuras”.

PROYECTO: El Estadio de Son Moix en Mallorca se construyó en 1999 al calor de las Olimpiadas de Barcelona del 92. Aunque al inicio se ideó como Estadio Olímpico, siempre se ha utilizado como estadio de fútbol. Su renovación ha permitido adecuarlo a las necesidades actuales. Por una parte, con el objetivo de acercar al aficionado al terreno de juego, se ha eliminado la pista de atletismo que estaba obsoleta. Por otra parte, también se quería integrar el estadio en el entorno, abrir el edificio a la ciudad y darle vida los 365 días del año, y para lo que se han creado diferentes espacios. ULMA ha ofrecido soluciones de encofrado y cimbra para la remodelación de este estadio mediante el encofrado modular Mesa VR arriostrado con puntales ALUPROP y el encofrado de vigas de madera ENKOFLEX combinado con Cimbra BRIO. El encofrado modular ORMA ha sido la solución idónea para los muros y CLR para los pilares circulares.

Más información sobre el proyecto: ulmaconstruction.es/es-es/ulma/noticias/remodelacion-estadio-son-moix-mallorca

ulmaconstruction.es/es-es

----------------------------------------------------------------------------------

“We chose ULMA because it’s a reference company, in addition to the long-standing relationship it has with Melchor Mascaró. For a project of this magnitude, you need a reliable company that can provide solutions for this type of structure.”

PROJECT: The Son Moix Stadium in Mallorca was built in 1999, inspired by the momentum of the 1992 Barcelona Olympics. Although it was initially designed as an Olympic Stadium, it has always been used as a football stadium. Its renovation has allowed it to meet current needs. On one hand, to bring fans closer to the pitch, the outdated athletics track was removed. On the other hand, the goal was also to integrate the stadium into its surroundings, open the building to the city, and bring it to life 365 days a year. To achieve this, various spaces have been created. ULMA provided formwork and shoring solutions for the stadium’s refurbishment using the Mesa VR modular formwork braced with ALUPROP props and the ENKOFLEX timber beam formwork combined with BRIO shoring. The ORMA modular formwork was the ideal solution for the walls, and CLR was used for the circular columns.

ulmaconstruction.com/en
Responsable de Obra, Melchor Mascaró, España – Why ULMA [es]Yacimientos de Atapuerca, Burgos, España – ULMA Construction [es]Side Alto da Boa Vista, São Paulo, Brasil - ULMA Construction [pt]Port Imperial II, West New York, NJ, USA - ULMA Construction [en]HR Manager ULMA Construction, US – Why ULMA [en]Hospital Angeles, Torre IV, Puebla, México - ULMA ConstructionATAL Sky+, Katowice, Polska - ULMA Construction [pl]112 West Beach Boulevard Gulf Shore, Alabama, USA - ULMA Construction [en]Montaje del encofrado modular recuperable ONADEK - ULMA Construction [es]Viaduto dos Pardais, Portugal - ULMA Construction [pt]Showroom Inmmersion - ULMA ConstructionViaduto Duarte Pacheco, Lisboa, Portugal - ULMA Construction [pt]
ULMA Construction |

Responsable de Obra, Melchor Mascaró, España – Why ULMA [es]

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER