Uploaded December 2025 | Updated September 2026, 2 weeks ago
It's been over four months since I uploaded part two of this series, so this is way overdue!
We finally have the methanol and soya been oil cars at West Birdwood yard, so its out with the switchers, to break up the manifest train and get our local made up. Once the local is assembled, the power is attached , and the train can head off to the Bio-Diesel plant.
This video is a bit long, but it will be the last "OP's" session on the Birdwood Sub, as next year will see the layout pulled down to move.
Trains are going a bit slow , as it was hot humid and trying to get good lighting requires lots of juggling with one person , so slow trans means more time to set up for shots.
Thanks and enjoy.
Gregg.
It's been over four months since I uploaded part two of this series, so this is way overdue!
We finally have the methanol and soya been oil cars at West Birdwood yard, so its out with the switchers, to break up the manifest train and get our local made up. Once the local is assembled, the power is attached , and the train can head off to the Bio-Diesel plant.
This video is a bit long, but it will be the last "OP's" session on the Birdwood Sub, as next year will see the layout pulled down to move.
Trains are going a bit slow , as it was hot humid and trying to get good lighting requires lots of juggling with one person , so slow trans means more time to set up for shots.
Thanks and enjoy.
Gregg.










