Uploaded March 2026 | Updated September 2026, 2 weeks ago
In this episode:
Inspiration for the clock build
Adding decorative veneer to the quadrant laminations for the clock frame.
Remedial work!
Cross banding and why it's used.
Vacuum bagging the curved face of the laminations.
Trial assembly.
Here is the link to the vacuum bag material I used in this episode:
https://boatcraft.com.au/Shop/index.php?main_page=product_info&cPath=197_198&products_id=902
In this episode:
Inspiration for the clock build
Adding decorative veneer to the quadrant laminations for the clock frame.
Remedial work!
Cross banding and why it's used.
Vacuum bagging the curved face of the laminations.
Trial assembly.
Here is the link to the vacuum bag material I used in this episode:
https://boatcraft.com.au/Shop/index.php?main_page=product_info&cPath=197_198&products_id=902










