TEPCO official video describing the automatic robot operations for cleaning the rail of the equipment hatch of the reactor 3 primary containment vessel.

In this area a high level of radiation has been measured and decontamination operations are required before the personnel can install the gas management system.

Document: tepco.co.jp/en/nu/fukushima-np/images/handouts_111122_02-e.pdf
Wiping work of rails for the equipment hatch, the Pressure Containment VesselQuince 2 exploring reactor 2 of Fukushima DaiichiManhole of the north side in the torus roomleakage of trench rubber boots of high pressure core spray system diesel generator room (3/3)Falling star seen from the space (meteors)Debris into Fuel Pool reactor 4 (1/2)Journalists visiting Fukushima Daiichi reactor 4Fukushima: decontamination around the truck bay door of unit 2Survey inside the SFP 4 Fukushima DaiichiRoute of the northeast side in the torus room (heat insulator)Survey and Cleaning in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station (3/3)Removal of the steel beam from pool at Fukushima
Antonio Bulgheroni (toto) |

Wiping work of rails for the equipment hatch, the Pressure Containment Vessel

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER