Uploaded November 2011 | Updated November 2026, 3 hours ago
TEPCO official video describing the automatic robot operations for cleaning the rail of the equipment hatch of the reactor 3 primary containment vessel.
In this area a high level of radiation has been measured and decontamination operations are required before the personnel can install the gas management system.
Document: tepco.co.jp/en/nu/fukushima-np/images/handouts_111122_02-e.pdf
TEPCO official video describing the automatic robot operations for cleaning the rail of the equipment hatch of the reactor 3 primary containment vessel.
In this area a high level of radiation has been measured and decontamination operations are required before the personnel can install the gas management system.
Document: tepco.co.jp/en/nu/fukushima-np/images/handouts_111122_02-e.pdf










