Route of the northeast side in the torus room (heat insulator) @hilbert00
Route of the northeast side in the torus room (heat insulator)  @hilbert00
Uploaded April 2012 | Updated November 2026, 11 hours ago
Inspection of Reactor 2 Torus of Fukushima Daiichi NPP

Official video released by TEPCO 18/4/2012
Route of the northeast side in the torus room (heat insulator)Survey and Cleaning in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station (3/3)Removal of the steel beam from pool at Fukushimaunderground water inflow at Unit 6 RW trench (part 3 of 7)TEPCO president visiting Fukushima DainiVirtual reality tour in the Fukushima reactor (Unit 3)underground water inflow at Unit 6 RW trench (part 7 of 7)Removing fresh fuel from Pool 4 at Fukushima (part 1 of 4)water leakage at Unit 6 Tb   switchgear room (2/2)Survey inside the SFP 4 Fukushima DaiichiVisual inspection inside reactor 2 PCV (part 2 of 4)Opening reactor 4 at Fukushima Daini
Antonio Bulgheroni (toto) |

Route of the northeast side in the torus room (heat insulator)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER