water leakage at Unit 6 Tb   switchgear room (2/2) @hilbert00
water leakage at Unit 6 Tb   switchgear room (2/2)  @hilbert00
Uploaded November 2011 | Updated November 2026, 2 hours ago
TEPCO Official video Typhoon 15 (ROKE)

September 22, 2011
water leakage at Unit 6 Tb   switchgear room (2/2)Survey inside the SFP 4 Fukushima DaiichiVisual inspection inside reactor 2 PCV (part 2 of 4)Opening reactor 4 at Fukushima DainiInvestigation inside reactor 1 with underwater CCDSurvey at the bottom of the well of unit 4 at Fukushima DaiichiRimozione dei detriti dal canale antistante i reattori 1 - 4Steel beam falling into pool 3 at FukushimaSteam like gas from reactor 3 at FukushimaSecond inspection in PCV R2 (part 7 of 7)Removing fresh fuel from Pool 4 at Fukushima (part 4 of 4)sea water hose of Unit 5 temporary residual heat removal system
Antonio Bulgheroni (toto) |

water leakage at Unit 6 Tb --- switchgear room (2/2)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER