Second inspection in PCV R2 (part 7 of 7) @hilbert00
Second inspection in PCV R2 (part 7 of 7)  @hilbert00
Uploaded March 2012 | Updated November 2026, 3 hours ago
Fukushima Nuclear Accident

Second inspection with a boroscope + thermocouple + ionization chamber inside the primary containment vessel of reactor 2.

Part 1: youtu.be/-eGbkDy5428
Part 2: youtu.be/yTBSmW6Z4wc
Part 3: youtu.be/EU4SIbQx35k
Part 4: youtu.be/vtQ2bT3W7ps
Part 5: youtu.be/cwytRus1KTM
Part 6: youtu.be/n6GgzV982Ss
Part 7: youtu.be/SNVF0Ex4vHo
Second inspection in PCV R2 (part 7 of 7)Removing fresh fuel from Pool 4 at Fukushima (part 4 of 4)sea water hose of Unit 5 temporary residual heat removal systemReport from the site of Fukushima Daiichi NPPInvestigation of the torus room in reactor 1Investigation results of TIP room of R1 (Fukushima)Monitoring radiation at Fukushima Daiichi JP (1/2)Punching a hole in the PCV of reactor 1 at Fukushima DaiichiChanges in radioactive concentration and dose rate at Fukushimadripping status at Unit 6 turbine operating floor (2/2)Exploring Fukushima reactor 2 (part 6 of 6)Unit 6 emergency switchgear (5)
Antonio Bulgheroni (toto) |

Second inspection in PCV R2 (part 7 of 7)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER