Fukushima: decontamination around the truck bay door of unit 2 @hilbert00
Fukushima: decontamination around the truck bay door of unit 2  @hilbert00
Uploaded June 2012 | Updated November 2026, 3 hours ago
TEPCO operators involved in the decontamination of one of the big entrance of Fukushima Daiichi reactor number 2. This operation aiming to drecrease the dose is done in view of the installation of alternative thermometers.
Fukushima: decontamination around the truck bay door of unit 2Survey inside the SFP 4 Fukushima DaiichiRoute of the northeast side in the torus room (heat insulator)Survey and Cleaning in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station (3/3)Removal of the steel beam from pool at Fukushimaunderground water inflow at Unit 6 RW trench (part 3 of 7)TEPCO president visiting Fukushima DainiVirtual reality tour in the Fukushima reactor (Unit 3)underground water inflow at Unit 6 RW trench (part 7 of 7)Removing fresh fuel from Pool 4 at Fukushima (part 1 of 4)water leakage at Unit 6 Tb   switchgear room (2/2)Survey inside the SFP 4 Fukushima Daiichi
Antonio Bulgheroni (toto) |

Fukushima: decontamination around the truck bay door of unit 2

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER