Uploaded January 2021 | Updated September 2026, 2 weeks ago
This week which was a odd short week to end off the year was actually quite productive. I managed to plumb most of our Hydronic In Floor Heat System, We installed a doggie door in the shop and we removed all of the insulation from the roof of the coop. At the same time we have a drywall crew working inside the shop getting all of the drywall done.
This week which was a odd short week to end off the year was actually quite productive. I managed to plumb most of our Hydronic In Floor Heat System, We installed a doggie door in the shop and we removed all of the insulation from the roof of the coop. At the same time we have a drywall crew working inside the shop getting all of the drywall done.