water flood at Unit 6 heater drain pump   switchgear room (part 1 of 2) @hilbert00
water flood at Unit 6 heater drain pump   switchgear room (part 1 of 2)  @hilbert00
Uploaded November 2011 | Updated November 2026, 2 days ago
TEPCO Official video

July 9, 2011
water flood at Unit 6 heater drain pump   switchgear room (part 1 of 2)Unit 3 Reactor Building Basement Torus Room InvestigationcamerettaInvestigation on the lower part of Unit 2 vent pipe at Fukushima Daiichi Nuclear Power StationCask in the Fuel Pool of reactor 4Results of Investigation around Lower Parts of Unit 1 Vent Pipes (First Day)Fukushima Core Status (1/2)water leakage point in Unit 3,4 S/B underground floor cable bolt roomSecond inspection in PCV R2 (part 4 of 7)accumulated water at Unit 6 reactor core isolation cooling system roomFuel rack (part 1)Measuring new emissions from reactors JP (2/2)
Antonio Bulgheroni (toto) |

water flood at Unit 6 heater drain pump --- switchgear room (part 1 of 2)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER