Results of Investigation around Lower Parts of Unit 1 Vent Pipes (First Day) @hilbert00
Results of Investigation around Lower Parts of Unit 1 Vent Pipes (First Day)  @hilbert00
Uploaded November 2013 | Updated November 2026, 3 hours ago
Images taken with a robo-boat around the suppression chamber of reactor number 1 at the Fukushima Daiichi Plant.

Video taken on November 13, 2013
Video taken by Hitachi-GE Nuclear Energy, Ltd.

Explanatory material: tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_131113_11-e.pdf
Results of Investigation around Lower Parts of Unit 1 Vent Pipes (First Day)Fukushima Core Status (1/2)water leakage point in Unit 3,4 S/B underground floor cable bolt roomSecond inspection in PCV R2 (part 4 of 7)accumulated water at Unit 6 reactor core isolation cooling system roomFuel rack (part 1)Measuring new emissions from reactors JP (2/2)water flood in Unit 6 switchgear room (part 3 of 6)Investigation of the operating floor of reactor 3Status of the sea in front of intake channelleakage of trench rubber boots of high pressure core spray system diesel generator room (2/3)Second inspection in PCV R2 (part 2 of 7)
Antonio Bulgheroni (toto) |

Results of Investigation around Lower Parts of Unit 1 Vent Pipes (First Day)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER