Investigation of the operating floor of reactor 3 @hilbert00
Investigation of the operating floor of reactor 3  @hilbert00
Uploaded July 2012 | Updated November 2026, 3 hours ago
TEPCO has inspected the status of the 4th and 5th floors of the FD reactor number 3.

Supporting document: tepco.co.jp/en/nu/fukushima-np/images/handouts_120711_03-e.pdf
Investigation of the operating floor of reactor 3Status of the sea in front of intake channelleakage of trench rubber boots of high pressure core spray system diesel generator room (2/3)Second inspection in PCV R2 (part 2 of 7)Exploring Fukushima reactor 2 (part 1 of 6)Removing fresh fuel from Pool 4 at Fukushima (part 2 of 4)Packbot inside reactor 1Removal of the RPV lid of R4 in Fukushima DainiWater Leakage (Main Steam Isolation Valve) reactor 3Inside PCV 2: Before insertionunderground water inflow at Unit 6 RW trench (part 6 of 7)Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Station
Antonio Bulgheroni (toto) |

Investigation of the operating floor of reactor 3

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER