Packbot inside reactor 1 @hilbert00
Packbot inside reactor 1  @hilbert00
Uploaded May 2012 | Updated November 2026, 3 hours ago
Another remote controlled robot enters the building of the Fukushima Daiichi reactor 1 to make a visual inspection and an aerial dose map.

Related documents
[JP]: tepco.co.jp/nu/fukushima-np/images/handouts_120525_04-j.pdf
Packbot inside reactor 1Removal of the RPV lid of R4 in Fukushima DainiWater Leakage (Main Steam Isolation Valve) reactor 3Inside PCV 2: Before insertionunderground water inflow at Unit 6 RW trench (part 6 of 7)Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Stationin front of Unit 3,4 S/B underground floor cable bolt room (part 2 of 3)
Antonio Bulgheroni (toto) |

Packbot inside reactor 1

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER