Second inspection in PCV R2 (part 2 of 7) @hilbert00
Second inspection in PCV R2 (part 2 of 7)  @hilbert00
Uploaded March 2012 | Updated November 2026, 3 hours ago
Fukushima Nuclear Accident

Second inspection with a boroscope + thermocouple + ionization chamber inside the primary containment vessel of reactor 2.

Part 1: youtu.be/-eGbkDy5428
Part 2: youtu.be/yTBSmW6Z4wc
Part 3: youtu.be/EU4SIbQx35k
Part 4: youtu.be/vtQ2bT3W7ps
Part 5: youtu.be/cwytRus1KTM
Part 6: youtu.be/n6GgzV982Ss
Part 7: youtu.be/SNVF0Ex4vHo
Second inspection in PCV R2 (part 2 of 7)Exploring Fukushima reactor 2 (part 1 of 6)Removing fresh fuel from Pool 4 at Fukushima (part 2 of 4)Packbot inside reactor 1Removal of the RPV lid of R4 in Fukushima DainiWater Leakage (Main Steam Isolation Valve) reactor 3Inside PCV 2: Before insertionunderground water inflow at Unit 6 RW trench (part 6 of 7)Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Stationin front of Unit 3,4 S/B underground floor cable bolt room (part 2 of 3)
Antonio Bulgheroni (toto) |

Second inspection in PCV R2 (part 2 of 7)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER