cameretta @hilbert00
cameretta  @hilbert00
Uploaded November 2011 | Updated November 2026, 1 hour ago
Giacomo sta per arrivare, ma noi siamo gia' quasi pronti
camerettaInvestigation on the lower part of Unit 2 vent pipe at Fukushima Daiichi Nuclear Power StationCask in the Fuel Pool of reactor 4Results of Investigation around Lower Parts of Unit 1 Vent Pipes (First Day)Fukushima Core Status (1/2)water leakage point in Unit 3,4 S/B underground floor cable bolt roomSecond inspection in PCV R2 (part 4 of 7)accumulated water at Unit 6 reactor core isolation cooling system roomFuel rack (part 1)Measuring new emissions from reactors JP (2/2)water flood in Unit 6 switchgear room (part 3 of 6)Investigation of the operating floor of reactor 3
Antonio Bulgheroni (toto) |

cameretta

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER