Updated UPSF Cab Ride! @signalupproductions
Updated UPSF Cab Ride!  @signalupproductions
Uploaded September 2019 | Updated September 2026, 2 hours ago
As promised, the newly modified UPSF Joint Line layout has been finished to the point where I could run the camera car around again.

Here is the URL to the cab ride video from over 2 years ago.

youtu.be/4AXD-dXE1NY

Since then we decided to separate the portion of main line that turned back on itself, and make it a more linear run. By doing this we were able to increase operating potential, add a new, much longer and much needed passing siding, and a few more industries.

In this video I decided to run the camera train in the Westbound direction. There was no other traffic on the line this day, so I had a clear shot to run all the way around non-stop.

Per a request in the original UPSF cab ride video, I ran the train with no engine sounds this time.

Be sure to watch the original as well as this one to compare the changes!

Please Like this video and Share it with your friends.
Updated UPSF Cab Ride!UP St. Marshall Subdivision in HO Scale Part 1 - Introduction to my new layoutUPSF Joint Line - Typical Operating SessionUP 4014 in KansasUP 844 Visits the UPSF Joint LineGateway Division NMRA Fall Meet 2023UP 3985 Clinton, IACora, IL Coal Train Unloadingz194 south at Effingham - CN 1776 and 2026 Lead the WayWireless Billy SimHogger. Dude, check this out!Steve Goarings HO Scale Illinois Terminal BranchScaleTrains Parody - from the movie Downfall
signalupproductions |

Updated UPSF Cab Ride!

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER