Time Lapse of Peikko’s Frame Solution in North America: A floor every three days! @PeikkoGroupCorp
Time Lapse of Peikko’s Frame Solution in North America: A floor every three days!  @PeikkoGroupCorp
Uploaded September 2016 | Updated September 2026, 2 days ago
Take a look at how a crew of 5 installers erect a floor plate of over 12,800 square ft (1,200 m2) in only three days by utilizing 25 ft (7.6 m) DELTABEAM® Composite Beams, composite columns, combined to long span prefabricated components such as 36 ft (11 m) hollow-core slabs. Peikko’s Frame Solution allows for exceptionally fast construction without an extensive workforce. Also, precast slabs do not require shoring consequently allowing for sub-trades to access the job site faster. Peikko Frame Solution is The Alternative to Post-Tensioned Structures.
Time Lapse of Peikko’s Frame Solution in North America: A floor every three days!Peikko Frame System for Faster ConstructionThe Story of PeikkoPeikko Flooring Products IntroductionConstruction of the Interxion MRS4 Data Center using BOLDA® and HPKM® Column ShoesACI Design for Peikko Designer® Column ConnectionDELTABEAM® Fire Test - SP Technical Research Institute 2009On a mission against punching shear failure? See the solution at BAUMA 2019Peikko PETRA - Support for Hollow-Core SlabsBolted Column Connections 30th anniversary: Don’t settle for the old way. Do it the PeikkoWay.TWIN Corbel – support for TT-slabs and secondary beamsDELTABEAM® Frame – Luxenbourg phase III project details
Peikko Group |

Time Lapse of Peikko’s Frame Solution in North America: A floor every three days!

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER