Construction of the Interxion MRS4 Data Center using BOLDA® and HPKM® Column Shoes @PeikkoGroupCorp
Construction of the Interxion MRS4 Data Center using BOLDA® and HPKM® Column Shoes  @PeikkoGroupCorp
Uploaded December 2021 | Updated September 2026, 4 days ago
This data center construction project both benefits from and demonstrates the benefits of Peikko's Bolted Column Connection systems.

Learn more on Peikko's Bolted Column Connection systems:
peikko.com/products/bolted-column-connections
Construction of the Interxion MRS4 Data Center using BOLDA® and HPKM® Column ShoesACI Design for Peikko Designer® Column ConnectionDELTABEAM® Fire Test - SP Technical Research Institute 2009On a mission against punching shear failure? See the solution at BAUMA 2019Peikko PETRA - Support for Hollow-Core SlabsBolted Column Connections 30th anniversary: Don’t settle for the old way. Do it the PeikkoWay.TWIN Corbel – support for TT-slabs and secondary beamsDELTABEAM® Frame – Luxenbourg phase III project detailsVorteile der Durchstanz- und Querkraftbewehrung von PeikkoPeikko Floor Joint SystemPeikko Bolted Connections – Endless PossibilitiesConstruction of Interxion MRS4 Data Center in Marseille with DELTABEAM® (English Subtitles)
Peikko Group |

Construction of the Interxion MRS4 Data Center using BOLDA® and HPKM® Column Shoes

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER