Studio Construction - Day 30 - Loft Stairs @vk2zay
Studio Construction - Day 30 - Loft Stairs  @vk2zay
Uploaded March 2023 | Updated November 2026, 2 hours ago
Another couple of interrupted days combined into one "day".

Cut down a dead tree and made some rough ship ladder stairs for the loft.

Definitely needs handrails to be safe and usable. The top stair tread is larger than the rest (wider and deeper), for now I used the same 2x8 as for all the other treads, I'll replace it with one cut to the exact size once the handrail is attached. I think I am just going to use 2x4s for the handrail for now. These are not nice final stairs, just something to make things easier during the build.

The double stringers are pretty heavy, each is two hemlock 2x12s almost 3 metres long. I had planned to use Douglas fir but all the 2x12 doug firs I had available are splitting or generally crappy being plain sawn, cuped, checked, shaked, having gum veins, etc. I guess I could have just made cleats instead of laminating a full and notched stringer on each side. I wanted them strong though, so I didn't want to do a routed stringer and the laminated notched and full stringer is a bit of a compromise between both with extra strength.
Studio Construction - Day 30 - Loft StairsACoC 2025: Day 5: Regulated Low-Volt Power SupplyAdvent Calendar of Circuits 2014: Day 6: Toroidal Inductors - The BasicsStudio Construction - Day 08 - North Girder WorkACoC 2025: Day 13: Forever Flasher Too?Studio Construction - Day 35 - West Gable WallACoC 2025: Day 9: Folded Cascode TIA555 Araneae JunkboxiusAdvent Calendar of Circuits 2011: Day 15: Toy Capacitive Touch OrganStudio Construction - Day 18 - More Floor InsulationPhotodiode Gamma Ray CounterAdvent Calendar of Circuits 2011: Day 7: Lightwave AM Transmitter & Receiver
Alan Yates |

Studio Construction - Day 30 - Loft Stairs

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER