Beautiful day today, but like most Tuesdays I could only work on the studio for a few hours.

Completed the framing for the west gable wall itself. Squared and plumbed up everything and secured the ridge beam at that end. On the north half I added the 1st common rafter and look-outs crossing the dropped gable top chord for later attachment of the barge rafter supporting the gable overhang.

Did some design work and measuring for the dormers. I think I will make the ridges match up to the main ridge directly and use a shingle-compatible minimal slope like 3/12 or 4/12 for the fairly short dormer rafter spans to maximise the headroom. I just can't bring myself to make a shed dormer, but am willing to have a different pitch for the dormers than the main roof.
Studio Construction - Day 35 - West Gable WallACoC 2025: Day 9: Folded Cascode TIA555 Araneae JunkboxiusAdvent Calendar of Circuits 2011: Day 15: Toy Capacitive Touch OrganStudio Construction - Day 18 - More Floor InsulationPhotodiode Gamma Ray CounterAdvent Calendar of Circuits 2011: Day 7: Lightwave AM Transmitter & ReceiverCrossette Bottle RocketStudio Construction - Day 13 - Fixing Middle Girder and Floor Framing1/2 TourbillionDay 17 Extra: More Info on the Flasher CircuitsAdvent Calendar of Circuits 2011: Day 19: Window Comparator Logic Probe
Alan Yates |

Studio Construction - Day 35 - West Gable Wall

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER