Uploaded December 2025 | Updated September 2026, 2 weeks ago
In the previous video we took apart the layout and moved it over to its new location. It was time to get things operational so I added a 3 foot extension to the original layout so we could get some trains going on it.
Overall the new section worked out quite well and I followed it up by adding the shelves back into place as well as moving the other two original layouts into place.
There is a plan to get those connected to this layout in the near future and I can't wait to see it all come together.
In the previous video we took apart the layout and moved it over to its new location. It was time to get things operational so I added a 3 foot extension to the original layout so we could get some trains going on it.
Overall the new section worked out quite well and I followed it up by adding the shelves back into place as well as moving the other two original layouts into place.
There is a plan to get those connected to this layout in the near future and I can't wait to see it all come together.










