An architect is working with a client on a new library project. The architect is currently preparing specification section 12-32-13: Manufactured Wood-Veneer-Faced Casework. After discussions with the client, the architect notes that the client’s main concern is that the plywood and finishes utilized are low-VOC, that the casework is constructed according to accepted industry standards, and that the contractor can obtain competitive quotes to keep costs down.
Which of the following types of specification should the architect prepare?
A. Proprietary Specification
B. Performance Specification
C. Reference Specification
💡Answer: C
An architect is working with a client on a new library project. The architect is currently preparing specification section 12-32-13: Manufactured Wood-Veneer-Faced Casework. After discussions with the client, the architect notes that the client’s main concern is that the plywood and finishes utilized are low-VOC, that the casework is constructed according to accepted industry standards, and that the contractor can obtain competitive quotes to keep costs down.
Which of the following types of specification should the architect prepare?
A. Proprietary Specification
B. Performance Specification
C. Reference Specification
💡Answer: C