Uploaded February 2024 | Updated September 2026, 3 weeks ago
This is the New Clark City - Clark Airport Access road drive. The entire stretch of the road was passable but some portions are still under construction. Also one of the scenic drives in Central Luzon. The road crosses some of the portions of the Zambales mountain range. New Clark City is a new township (planned community) outside National Capital Region. Located within the Clark special economic zone, the 9,000+ hectare development is situated within Bamban and Capas Tarlac.
The road is 3x3 lanes with beautiful cut sections of mountains.
This video starts from Bgy Sta Lucia in Capas and ends in the Clark Airport rotunda. The road is self sustaining with solar powered street lamps. There are portions still under construction. There are wide pedestrian lanes on the side. Speed limit is 60 km/h. Finally got the chance to cross the New Sacobia River bridge too.
PS.
- was opened to motorists for the Philippine hot air balloon festival
#BCDA #NCC #ClarkPampanga #Tarlac #Capas
This is the New Clark City - Clark Airport Access road drive. The entire stretch of the road was passable but some portions are still under construction. Also one of the scenic drives in Central Luzon. The road crosses some of the portions of the Zambales mountain range. New Clark City is a new township (planned community) outside National Capital Region. Located within the Clark special economic zone, the 9,000+ hectare development is situated within Bamban and Capas Tarlac.
The road is 3x3 lanes with beautiful cut sections of mountains.
This video starts from Bgy Sta Lucia in Capas and ends in the Clark Airport rotunda. The road is self sustaining with solar powered street lamps. There are portions still under construction. There are wide pedestrian lanes on the side. Speed limit is 60 km/h. Finally got the chance to cross the New Sacobia River bridge too.
PS.
- was opened to motorists for the Philippine hot air balloon festival
#BCDA #NCC #ClarkPampanga #Tarlac #Capas










