The first activation is shown at 5:20
This is the Camms Road level crossing at Cranbourne, Victoria. The crossing will be replaced by a road overpass as part of the Level Crossing Removal Project, with construction of the overpass scheduled to begin during 2022 and completed in 2024.
As of January 11, 2022 the crossing was temporarily closed and the signals removed to allow for the addition of a second track as part of the Cranbourne Line Duplication Project. The crossing reopened on February 7, 2022 with brand new signals which can be seen in this video youtube.com/watch?v=cDb5waJssrc
At the time of filming on June 20, 2021 both signals had unmarked bases, Westinghouse EB gate mechanisms, Artcraft gate lights, GEC Alsthom incandescent lights and Westinghouse hybrid bells. The bell on the eastern signal rang from start up until the gates had lowered, while the bell on the western signal rang until the gates began to rise. The pedestrian crossing had Magnetic Automation swing gates.
Filmed on June 20, 2021.
The first activation is shown at 5:20
This is the Camms Road level crossing at Cranbourne, Victoria. The crossing will be replaced by a road overpass as part of the Level Crossing Removal Project, with construction of the overpass scheduled to begin during 2022 and completed in 2024.
As of January 11, 2022 the crossing was temporarily closed and the signals removed to allow for the addition of a second track as part of the Cranbourne Line Duplication Project. The crossing reopened on February 7, 2022 with brand new signals which can be seen in this video youtube.com/watch?v=cDb5waJssrc
At the time of filming on June 20, 2021 both signals had unmarked bases, Westinghouse EB gate mechanisms, Artcraft gate lights, GEC Alsthom incandescent lights and Westinghouse hybrid bells. The bell on the eastern signal rang from start up until the gates had lowered, while the bell on the western signal rang until the gates began to rise. The pedestrian crossing had Magnetic Automation swing gates.
Filmed on June 20, 2021.