How Europe built the final ITER Vacuum Vessel sector @fusionforenergy
How Europe built the final ITER Vacuum Vessel sector  @fusionforenergy
Uploaded November 2026 | Updated November 2026, 1 day ago
Europe achieved a massive industrial feat in its contribution to ITER.

The fifth and last European Vacuum Vessel sector has arrived in ITER, the world’s largest fusion project.

Fusion for Energy (F4E) worked with Ansaldo Nucleare, Westinghouse, and Walter Tosto to manufacture this component. Its delivery closes a 16-year project that involved a supply chain of at least 15 European companies.

The Vacuum Vessel's story: https://fusionforenergy.europa.eu/news/europe-completes-the-last-iter-vacuum-vessel-sector/

Vacuum Vessel poster: https://fusionforenergy.europa.eu/wp-content/uploads/2025/03/VV_Poster_2025_small.jpg

What is ITER: https://fusionforenergy.europa.eu/iter/
How Europe built the final ITER Vacuum Vessel sectorTime lapse from inside the Poloidal Field Coils Winding FacilityITER from above - April 2023tir_mine.movFinal manufacturing steps of Europes Toroidal Field coils for ITER perfomed at SIMIC (IT).The ITER site from above - Drone, October 2016ITER worksite Progress - August 2018ITER Assembly Ceremony- Virtual Tour on-siteInside the ITER Vacuum Vessel factoryF4E Roundtable - OpeningITER Worksite,  F4E Work progress September 2010ITER site from above - June 2020
FUSION FOR ENERGY |

How Europe built the final ITER Vacuum Vessel sector

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER