Final manufacturing steps of Europes Toroidal Field coils for ITER perfomed at SIMIC (IT). @fusionforenergy
Final manufacturing steps of Europes Toroidal Field coils for ITER perfomed at SIMIC (IT).  @fusionforenergy
Uploaded March 2020 | Updated September 2026, 4 hours ago
Europe is responsible for 10 of the Toroidal Field coils which will create a massive magnetic cage to confine the hot plasma of ITER- the biggest fusion device. There are several steps in the fabrication of each of these complex magnets which measure 17 x 9 m and weigh 320 tonnes each— as much as an Airbus A350. When powered with current (68 000 A) their magnetic field will reach up to 11.8 Tesla—about 250 000 times the magnetic field of the Earth! In this clip we visit the SIMIC factory (Marghera, Venice, Italy) where the final manufacturing steps are performed. To view the preceding steps click youtube.com/watch?v=AaRW50ZSqmk.
Do not use without receiving prior acknowledgement from SIMIC. Copyright: SIMIC
Final manufacturing steps of Europes Toroidal Field coils for ITER perfomed at SIMIC (IT).The ITER site from above - Drone, October 2016ITER worksite Progress - August 2018ITER Assembly Ceremony- Virtual Tour on-siteInside the ITER Vacuum Vessel factoryF4E Roundtable - OpeningITER Worksite,  F4E Work progress September 2010ITER site from above - June 2020Cadarache, ITER 360Worlds Largest Puzzle: Assembly of the ITER CryostatPaving the way to ITER - 10 Years working together to bring the power of the sun to earthTokamak complex December 2011
FUSION FOR ENERGY |

Final manufacturing steps of Europe's Toroidal Field coils for ITER perfomed at SIMIC (IT).

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER