Uploaded March 2021 | Updated November 2026, 3 hours ago
Eric Dollard walks the EPD Laboratories building after a week of cleanup and says what each space is meant to become: a central office room for the analog to digital converters, the T carrier system, the Pythagorean master oscillator and the analog computer, double-walled and screened with chicken wire against the RF; a laboratory space where the garage now is; and a battery bank running at minus 48, plus 24 and plus 130 volts DC. He explains why the site is unsafe as wired, with the high voltage neutral bonded through to the building steel next to the buried water tanks, and what a symmetrical three-phase service would cost to put in. The video ends in the parts container, which he compares to the radio room of a navy ship.
Chapters
0:00 Cleaning up and the central office room
4:09 What the racks will hold
5:48 Through the main laboratory space
7:22 The battery bank and DC voltages
9:59 What the electrical system has to become
13:17 Why the power company is the problem
17:22 Into the parts container
19:49 Sorting a museum's worth of equipment
ericpdollard.com/donate
emediapress.com/product-category/authors-presenters/eric-dollard
emediapress.com
emediapress.com/energytimes
EPD Laboratories, Inc. building update, recorded 2020-10-11. Posted 2021-03-18.
Eric Dollard walks the EPD Laboratories building after a week of cleanup and says what each space is meant to become: a central office room for the analog to digital converters, the T carrier system, the Pythagorean master oscillator and the analog computer, double-walled and screened with chicken wire against the RF; a laboratory space where the garage now is; and a battery bank running at minus 48, plus 24 and plus 130 volts DC. He explains why the site is unsafe as wired, with the high voltage neutral bonded through to the building steel next to the buried water tanks, and what a symmetrical three-phase service would cost to put in. The video ends in the parts container, which he compares to the radio room of a navy ship.
Chapters
0:00 Cleaning up and the central office room
4:09 What the racks will hold
5:48 Through the main laboratory space
7:22 The battery bank and DC voltages
9:59 What the electrical system has to become
13:17 Why the power company is the problem
17:22 Into the parts container
19:49 Sorting a museum's worth of equipment
ericpdollard.com/donate
emediapress.com/product-category/authors-presenters/eric-dollard
emediapress.com
emediapress.com/energytimes
EPD Laboratories, Inc. building update, recorded 2020-10-11. Posted 2021-03-18.










