Uploaded October 2025 | Updated November 2026, 13 hours ago
Justin Miller and the EPD crew stand a 25 foot pole beside the hilltop shack, the third on the site, intended to carry data logger equipment and possibly a weather station. The VHF antenna is to migrate onto it, and it will also provide an overhead route to an existing dish that predates their right of way and is being left in place. Connor dug the hole with a recently acquired jackhammer; the pole is walked up by hand with straps and then plumbed with two levels across two planes before backfilling.
Chapters
0:00 What the new pole is for
2:19 Standing it with straps and hands
4:49 Backfilling and plumbing it level
epdlabs.org/seismic-streaming
ericpdollard.com/donate
emediapress.com/product-category/authors-presenters/eric-dollard
emediapress.com
emediapress.com/energytimes
EPD Laboratories, 2025 Aug-Sep earth signals work episode. Posted 2025-10-28.
Justin Miller and the EPD crew stand a 25 foot pole beside the hilltop shack, the third on the site, intended to carry data logger equipment and possibly a weather station. The VHF antenna is to migrate onto it, and it will also provide an overhead route to an existing dish that predates their right of way and is being left in place. Connor dug the hole with a recently acquired jackhammer; the pole is walked up by hand with straps and then plumbed with two levels across two planes before backfilling.
Chapters
0:00 What the new pole is for
2:19 Standing it with straps and hands
4:49 Backfilling and plumbing it level
epdlabs.org/seismic-streaming
ericpdollard.com/donate
emediapress.com/product-category/authors-presenters/eric-dollard
emediapress.com
emediapress.com/energytimes
EPD Laboratories, 2025 Aug-Sep earth signals work episode. Posted 2025-10-28.










