Two-Stage Tesla Turbine, Explained and Assembled — Ferwerda @AaronMurakami13
Two-Stage Tesla Turbine, Explained and Assembled — Ferwerda  @AaronMurakami13
Uploaded March 2021 | Updated November 2026, 2 days ago
Jeremiah Ferwerda of iEnergySupply assembles and explains his two-stage Tesla turbine at Aaron Murakami's shop in January 2021. The pump stage exists to reduce back pressure: as the supersonic ping-pong ball experiment shows, an evacuated exhaust leaves nothing in the way, and Tesla's rule is three times the volume in the pump because the gas expands. This unit has eleven discs on the drive and thirty-three on the pump on a common shaft, with a stationary ring between the stages so the flow cannot bypass the pump; ideally the pump would be larger in diameter so its peripheral velocity holds up under load. He goes through end plates and star washers at near 1/64 inch spacing, the dual inlet nozzles, and the bearings, hybrid steel-race with silicon nitride balls, full ceramic, and a rubber race around the bearing to damp vibration as turbochargers do. The turbine has already run on water boiling at 165 degrees under vacuum, and methylene chloride, the drinking-bird fluid, is next. CAD and STL files are on his Patreon tiers, carbon fibre rotors and air bearings are in progress, and a full system was planned for the 2021 conference. The assembled unit is spun on shop air at the end, well below its 32,000 rpm rating.

Chapters
0:00 Jeremiah and iEnergySupply
2:44 The supersonic ping-pong ball
4:13 Eleven discs drive, thirty-three pump
5:46 End plates, star washers and the ring
7:45 Housings and dual nozzles
8:48 Steam, water under vacuum, methylene chloride
10:20 Hybrid and ceramic bearings, rubber races
12:50 Assembling the rotor
16:40 3D printing, carbon fiber and the 2021 conference
22:13 Spinning it on shop air

emediapress.com
emediapress.com/energytimes

Recorded 2021-01-13. Posted 2021-03-22.
Two-Stage Tesla Turbine, Explained and Assembled — FerwerdaBedinis Glass Case Motor — Every Dimension and SpecThe Gray Motor Will Not Start Below 500 RPM4,800 Feet of Antenna, Against 880 at Landers — EPD 2025Six Ground Rods, Because Ground Rods Do Not Actually GroundTesla Brush Bulbs on the Cosmic Induction Generator — 2022The Power of the Vacuum and Reichs Orgone MotorSky Huddleston on the Bourke Engine — 2021 ESTC PreviewGriffin Brock on Teslas High Frequency IlluminationWhy Filtered Water Isnt Pure Water - Aaron MurakamiBedini Invited Anyone to Drill Into the BoxThe Cheap Panel Beats the Good One Under Cloud — Lindemann
Aaron Murakami |

Two-Stage Tesla Turbine, Explained and Assembled — Ferwerda

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER