The architect is stamping a set of drawings to be issued for permit. Which of the following is not required?
A. Signature over stamp
B. License renewal date
C. Statement of licensure
D. License issue date
đź’ˇAnswer: D. License issue date
The architect is stamping a set of drawings to be issued for permit. Which of the following is not required?
A. Signature over stamp
B. License renewal date
C. Statement of licensure
D. License issue date
đź’ˇAnswer: D. License issue date