Uploaded May 2026 | Updated November 2026, 2 days ago
HS2 Ltd confirmed that Taylor Woodrow Infrastructure Ltd and Aureos Rail Ltd (TWA JV) will build the high-speed railway’s control centre and rolling stock depot in a deal set to transform a brown field site in Birmingham into a major new business and logistics hub supporting more than a thousand jobs.
The contract – worth around £856m – will see the joint venture work with HS2 Ltd to develop the disused 70-hectare site of the former LDV and Metro-Cammell works in Washwood Heath.
The new depot will cover around 30-hectares and include a state-of-the-art Rolling Stock Maintenance Building, Carriage Wash, Automatic Vehicle Inspection Building and sidings where high-speed trains can be stored overnight as well as a test track.
Also on the same site will be the Network Integrated Control Centre (NICC), where staff will manage the dispatch of trains, communicate with drivers and ensure that services run smoothly.
Separate buildings will house offices and facilities for cleaners and drivers. The remaining area will be released for commercial development and used to create new green spaces and wildlife habitat.
According to 2021 Census data, Washwood Heath is ranked among the most deprived areas in the UK, with roughly 77% of households experiencing deprivation in at least one dimension.
The new depot will provide valuable highly skilled jobs, with around a thousand long-term jobs expected to be created at the site – as well as around 500 temporary roles during construction.
📢 Subscribe for the latest news and updates from Britain’s high-speed railway, HS2.
Follow us on social media:
💼 X: twitter.com/HS2ltd
📸 Instagram: instagram.com/hs2ltd
📘 Facebook: facebook.com/HS2ltd
🔗 LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:30 The largest UK depot for railways
0:54 Announcing the contract
1:10 Jobs and commercial development
1:30 Thoughts from the Mayor of the West Midlands
2:13 More on the depot
2:58 Learn about the site
3:20 Engaging with the local area
4:09 Outro
#HS2 #Train #Rail #Infrastructure #Construction #HighSpeedRail #Engineering #birmingham
Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
📞 Call: 08081 434 434
📧 Email: hs2enquiries@hs2.org.uk
HS2 Ltd confirmed that Taylor Woodrow Infrastructure Ltd and Aureos Rail Ltd (TWA JV) will build the high-speed railway’s control centre and rolling stock depot in a deal set to transform a brown field site in Birmingham into a major new business and logistics hub supporting more than a thousand jobs.
The contract – worth around £856m – will see the joint venture work with HS2 Ltd to develop the disused 70-hectare site of the former LDV and Metro-Cammell works in Washwood Heath.
The new depot will cover around 30-hectares and include a state-of-the-art Rolling Stock Maintenance Building, Carriage Wash, Automatic Vehicle Inspection Building and sidings where high-speed trains can be stored overnight as well as a test track.
Also on the same site will be the Network Integrated Control Centre (NICC), where staff will manage the dispatch of trains, communicate with drivers and ensure that services run smoothly.
Separate buildings will house offices and facilities for cleaners and drivers. The remaining area will be released for commercial development and used to create new green spaces and wildlife habitat.
According to 2021 Census data, Washwood Heath is ranked among the most deprived areas in the UK, with roughly 77% of households experiencing deprivation in at least one dimension.
The new depot will provide valuable highly skilled jobs, with around a thousand long-term jobs expected to be created at the site – as well as around 500 temporary roles during construction.
📢 Subscribe for the latest news and updates from Britain’s high-speed railway, HS2.
Follow us on social media:
💼 X: twitter.com/HS2ltd
📸 Instagram: instagram.com/hs2ltd
📘 Facebook: facebook.com/HS2ltd
🔗 LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:30 The largest UK depot for railways
0:54 Announcing the contract
1:10 Jobs and commercial development
1:30 Thoughts from the Mayor of the West Midlands
2:13 More on the depot
2:58 Learn about the site
3:20 Engaging with the local area
4:09 Outro
#HS2 #Train #Rail #Infrastructure #Construction #HighSpeedRail #Engineering #birmingham
Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
📞 Call: 08081 434 434
📧 Email: hs2enquiries@hs2.org.uk










