Contracts awarded for HS2s high-tech train depot and control centre @HS2ltd
Contracts awarded for HS2s high-tech train depot and control centre  @HS2ltd
Uploaded May 2026 | Updated November 2026, 2 days ago
HS2 Ltd confirmed that Taylor Woodrow Infrastructure Ltd and Aureos Rail Ltd (TWA JV) will build the high-speed railway’s control centre and rolling stock depot in a deal set to transform a brown field site in Birmingham into a major new business and logistics hub supporting more than a thousand jobs.

The contract – worth around £856m – will see the joint venture work with HS2 Ltd to develop the disused 70-hectare site of the former LDV and Metro-Cammell works in Washwood Heath.

The new depot will cover around 30-hectares and include a state-of-the-art Rolling Stock Maintenance Building, Carriage Wash, Automatic Vehicle Inspection Building and sidings where high-speed trains can be stored overnight as well as a test track.

Also on the same site will be the Network Integrated Control Centre (NICC), where staff will manage the dispatch of trains, communicate with drivers and ensure that services run smoothly.

Separate buildings will house offices and facilities for cleaners and drivers. The remaining area will be released for commercial development and used to create new green spaces and wildlife habitat.

According to 2021 Census data, Washwood Heath is ranked among the most deprived areas in the UK, with roughly 77% of households experiencing deprivation in at least one dimension.

The new depot will provide valuable highly skilled jobs, with around a thousand long-term jobs expected to be created at the site – as well as around 500 temporary roles during construction.

📢 Subscribe for the latest news and updates from Britain’s high-speed railway, HS2.

Follow us on social media:
💼 X: twitter.com/HS2ltd
📸 Instagram: instagram.com/hs2ltd
📘 Facebook: facebook.com/HS2ltd
🔗 LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd

0:00 Introduction
0:30 The largest UK depot for railways
0:54 Announcing the contract
1:10 Jobs and commercial development
1:30 Thoughts from the Mayor of the West Midlands
2:13 More on the depot
2:58 Learn about the site
3:20 Engaging with the local area
4:09 Outro

#HS2 #Train #Rail #Infrastructure #Construction #HighSpeedRail #Engineering #birmingham

Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
📞 Call: 08081 434 434
📧 Email: hs2enquiries@hs2.org.uk
Contracts awarded for HS2s high-tech train depot and control centreHow HS2 are connecting two major super structures below ground🚆 Discover the Victoria Road Crossover Box – A Key Part of HS2 Near Old Oak Common 🏗️Inside HS2’s latest train design | First look at the future of high-speed travel #shortHS2’s Tallest Bridge: Pushing a 4,200-tonne giant into BirminghamHS2 Old Oak Common Station Project Update | October 2024HS2 reveals two giant tunnelling machines preparing to dig Euston TunnelFirst completed viaduct structure on key HS2 junction #shortsCome on board an HS2 tunnelling machine in Birmingham #shortsHS2 begins assembling Turweston green bridge deckHS2’s Longhole viaduct crosses the Grand Union Canal in WarwickshireHS2 engineers prepare to launch second viaduct over the M6 #short
HS2 Ltd |

Contracts awarded for HS2's high-tech train depot and control centre

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER