The Victoria Road Crossover Box, located near Old Oak Common in West London, plays a crucial role in the HS2 project. This massive underground structure will house a crossover track mechanism, allowing HS2 trains to seamlessly switch tracks as they approach and depart from Old Oak Common station.
Within this underground box, HS2 is also constructing the Old Oak Common Tunnel, which forms part of the Northolt Tunnel East, connecting Old Oak Common to Greenford. The 360-meter-long tunnel will run 12 meters below ground, passing beneath Kildun Court and Wells House Road.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:20 What is the Victoria Road Crossover Box?
0:47 Tunnelling towards Old Oak Common Station
1:19 Why was a tunnel needed here?
1:36 Creating a pilot tunnel
2:13 Sprayed concrete lining
3:16 What works are next for the upline tunnel?
3:26 Constructing the downline tunnel
4:35 Closing comments
5:06 Outro
#HS2 #Construction #tunnel
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
The Victoria Road Crossover Box, located near Old Oak Common in West London, plays a crucial role in the HS2 project. This massive underground structure will house a crossover track mechanism, allowing HS2 trains to seamlessly switch tracks as they approach and depart from Old Oak Common station.
Within this underground box, HS2 is also constructing the Old Oak Common Tunnel, which forms part of the Northolt Tunnel East, connecting Old Oak Common to Greenford. The 360-meter-long tunnel will run 12 meters below ground, passing beneath Kildun Court and Wells House Road.
Follow us on social media:
Twitter: twitter.com/HS2ltd
Instagram: instagram.com/hs2ltd
Facebook: facebook.com/HS2ltd
LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Introduction
0:20 What is the Victoria Road Crossover Box?
0:47 Tunnelling towards Old Oak Common Station
1:19 Why was a tunnel needed here?
1:36 Creating a pilot tunnel
2:13 Sprayed concrete lining
3:16 What works are next for the upline tunnel?
3:26 Constructing the downline tunnel
4:35 Closing comments
5:06 Outro
#HS2 #Construction #tunnel
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.