Inside HS2’s latest train design | First look at the future of high-speed travel #short @HS2ltd
Inside HS2’s latest train design | First look at the future of high-speed travel #short  @HS2ltd
Uploaded August 2025 | Updated November 2026, 2 days ago
Join us for a behind-the-scenes tour as we step into the future and see what a journey onboard an HS2 train might be like.

Designed with passengers in mind, the concept designs for the train interior have been shaped by feedback from over 500 people from across the UK. This is believed to be the country’s largest-ever public input programme for rail design.

From step-free access at HS2 stations and redesigned wheelchair spaces to child-friendly features and modern tech – this is inclusive, next-gen travel built for real-world needs.

👀 What’s inside?
✔️ More legroom than any other UK standard class train
✔️ Smart luggage storage and charging ports (USB-C & 3-pin)
✔️ Family-friendly toilets with baby changing tables
✔️ Modern bike storage that saves space and time
✔️ Inclusive design: visual and audio aids, accessible seating

This showcase marks a major milestone for HS2 Ltd, West Coast Partnership Development, and train manufacturers Hitachi-Alstom High Speed. The Class 895 fleet will be among the fastest, quietest, and most energy-efficient trains in the world. They will be built in the UK - supporting thousands of jobs in the Midlands and the North.

💼 Built in Derby, Durham and Crewe
🛠️ Supporting 2,500 UK jobs
⚡ 100% electric
🚆 Top speed: 225mph (360km/h)

With design work powering ahead, the future of high-speed travel is taking shape. Watch now for a first glimpse of what’s coming.

📢 Subscribe for the latest news and updates from Britain’s high-speed railway, HS2.

Follow us on social media:
💼 X: twitter.com/HS2ltd
📸 Instagram: instagram.com/hs2ltd
📘 Facebook: facebook.com/HS2ltd
🔗 LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd

#HS2 #TrainDesign #SustainableTravel #UKRail #TransportInnovation #HS2Trains #AccessibleDesign #TrainTour #Class895

Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
📞 Call: 08081 434 434
📧 Email: hs2enquiries@hs2.org.uk
Inside HS2’s latest train design | First look at the future of high-speed travel #shortHS2’s Tallest Bridge: Pushing a 4,200-tonne giant into BirminghamHS2 Old Oak Common Station Project Update | October 2024HS2 reveals two giant tunnelling machines preparing to dig Euston TunnelFirst completed viaduct structure on key HS2 junction #shortsCome on board an HS2 tunnelling machine in Birmingham #shortsHS2 begins assembling Turweston green bridge deckHS2’s Longhole viaduct crosses the Grand Union Canal in WarwickshireHS2 engineers prepare to launch second viaduct over the M6 #shortHS2 celebrates halfway point for pioneering Thame Valley ViaductHS2 in West London: from trains to cranes - spotlight on City & DocklandsHuge HS2 viaduct section moved into place over the M6 motorway
HS2 Ltd |

Inside HS2’s latest train design | First look at the future of high-speed travel #short

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER