Uploaded August 2021 | Updated September 2026, 1 week ago
The heat wave is over, so back out to the shop to get some welding done. First project to tackle is the rear hubs, or uprights, as some call them. In this first part, I fabricate the main box frame and ball joint socket; building a foundation structure for the brake caliper, wheel bearing and tow adjustment arm.
The heat wave is over, so back out to the shop to get some welding done. First project to tackle is the rear hubs, or uprights, as some call them. In this first part, I fabricate the main box frame and ball joint socket; building a foundation structure for the brake caliper, wheel bearing and tow adjustment arm.










