Uploaded August 2025 | Updated November 2026, 20 hours ago
Take a closer look at HS2โs Green Corridorโs largest habitat creation project, turning a current construction site into a thriving chalk grassland habitat of international importance in the Chiltern Hills ๐๏ธ.
Chalk grassland ๐ชจ๐ฟ is a calcareous habitat found across south-east England and the Isle of Wight. This 90-hectare initiative seeds chalk grassland into re-profiled soils, using nutrient-poor subsoils and chalk from tunnelling, combined with recycled concrete and aggregates from construction works โป๏ธ.
The project sits alongside new woodlands๐ณ, wood pasture ๐, and wetlands ๐ง, including almost 65,000 trees and shrubs across 32 species and nearly 3.5 km (nearly 2 miles) of hedgerows on the western slopes of the River Colne.
The result is enhanced biodiversity, improved habitat connectivity, and a clear demonstration of how large-scale infrastructure can regenerate landscape and support nature.
๐ข Subscribe for the latest news and updates from Britainโs high-speed railway, HS2.
Follow us on social media:
๐ผ X: twitter.com/HS2ltd
๐ธ Instagram: instagram.com/hs2ltd
๐ Facebook: facebook.com/HS2ltd
๐ LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Where is the habitat?
0:29 What is the project?
1:37 Designing the area
2:13 Using the right type of soil
3:57 Tree planing, fencing and user routes
4:45 Whatโs next?
5:17 Improving the area before
5:49 A design led project
6:24 A naturalistic landscape
6:44 Lasting legacy
7:25 Final thoughts
7:56 Outro
#HS2 #Train #Rail #Infrastructure #Construction #HighSpeedRail #Engineering #environment #biodiversity
Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
๐ Call: 08081 434 434
๐ง Email: hs2enquiries@hs2.org.uk
Take a closer look at HS2โs Green Corridorโs largest habitat creation project, turning a current construction site into a thriving chalk grassland habitat of international importance in the Chiltern Hills ๐๏ธ.
Chalk grassland ๐ชจ๐ฟ is a calcareous habitat found across south-east England and the Isle of Wight. This 90-hectare initiative seeds chalk grassland into re-profiled soils, using nutrient-poor subsoils and chalk from tunnelling, combined with recycled concrete and aggregates from construction works โป๏ธ.
The project sits alongside new woodlands๐ณ, wood pasture ๐, and wetlands ๐ง, including almost 65,000 trees and shrubs across 32 species and nearly 3.5 km (nearly 2 miles) of hedgerows on the western slopes of the River Colne.
The result is enhanced biodiversity, improved habitat connectivity, and a clear demonstration of how large-scale infrastructure can regenerate landscape and support nature.
๐ข Subscribe for the latest news and updates from Britainโs high-speed railway, HS2.
Follow us on social media:
๐ผ X: twitter.com/HS2ltd
๐ธ Instagram: instagram.com/hs2ltd
๐ Facebook: facebook.com/HS2ltd
๐ LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
0:00 Where is the habitat?
0:29 What is the project?
1:37 Designing the area
2:13 Using the right type of soil
3:57 Tree planing, fencing and user routes
4:45 Whatโs next?
5:17 Improving the area before
5:49 A design led project
6:24 A naturalistic landscape
6:44 Lasting legacy
7:25 Final thoughts
7:56 Outro
#HS2 #Train #Rail #Infrastructure #Construction #HighSpeedRail #Engineering #environment #biodiversity
Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
๐ Call: 08081 434 434
๐ง Email: hs2enquiries@hs2.org.uk
![First FPV drone flythrough of HS2โs Old Oak Common Station #shorts
Enjoy this unique FPV experience of flying through the huge box structure as engineers begin the next phase of construction 20 metres below ground, where six dedicated high speed platforms will be built, as well as the station building itself.
]Follow us on social media:
Twitter: https://twitter.com/HS2ltd
Instagram: https://www.instagram.com/hs2ltd/
Facebook: https://www.facebook.com/HS2ltd
LinkedIn: https://www.linkedin.com/company/high-speed-two-hs2-ltd/
#HS2 #Construction #dronevideo #fpvdrone #engineering #trainstation
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk. First FPV drone flythrough of HS2โs Old Oak Common Station #shorts](https://i.ytimg.com/vi/srgAdiotafw/mqdefault.jpg)









