Take a look inside HS2's Bromford Intermediate Shaft in Birmingham – an important 65-metre deep ventilation shaft connecting to the Bromford Tunnel.

In this video, we explore the engineering behind the structure, including the five internal levels that will house mechanical and electrical rooms. Discover how our team used slip form construction to build 18 internal walls, and how sprayed concrete lining methods created the cavern works at the pit bottom.

The shaft provides essential ventilation to the running tunnels and enables crucial services including cable ducts, water mains, and power cables to reach the tunnel network below.

We also showcase the innovative technology being used on site, including gyroscope-equipped tower cranes that allow precise lifting through an 8.5 by 5-metre opening.

Find out more about the Bromford Tunnel: hs2.org.uk/building-hs2/tunnels/tunnel-drives/bromford-tunnel

πŸ“’ Subscribe for the latest news and updates from Britain’s high-speed railway, HS2.

Follow us on social media:
πŸ’Ό X: twitter.com/HS2ltd
πŸ“Έ Instagram: instagram.com/hs2ltd
πŸ“˜ Facebook: facebook.com/HS2ltd
πŸ”— LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd

0:00 Introduction
0:20 What is the shaft?
0:33 The internal levels
0:40 Digging down
0:55 Constructing the internal walls
1:23 Challenges on site
1:40 Completion of the cavern works
2:09 Inside the shaft
2:32 Outside the shaft
2:42 Innovations
3:18 Collaborative work ethic
3:37 Outro

#HS2 #Train #Rail #Infrastructure #Construction #HighSpeedRail #Engineering #birmingham

Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
πŸ“ž Call: 08081 434 434
πŸ“§ Email: hs2enquiries@hs2.org.uk
Inside HS2’s Bromford Tunnel Intermediate ShaftInside HS2’s archaeology warehouse: Preserving hidden treasures #shortsBuilding a railway | How HS2 will take shapeGiant HS2 box structure in South Warwickshire approaches final phase of construction #shortHS2 Thame Valley Viaduct reaches halfway point #shortsHS2 in West London: from trains to cranes - spotlight on Barratt London
HS2 Ltd |

Inside HS2’s Bromford Tunnel Intermediate Shaft

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER