We're building HS2 – Britain's new high-speed railway to free up space on the existing network, boost economic growth, cut journey times, and support thousands of jobs.

Like building a house, we need to build the railway in the right order. Completing each stage safely before moving to the next. Here's how we're doing it.

First, we prepare the ground. Then we build the major structures and stations. Next come the railway systems, like track, signalling and communications and the fleet of new trains.

Finally, the railway is thoroughly tested before opening to passengers. We’re in peak construction – building tunnels, viaducts, cuttings and stations. It's the most intensive phase of building the railway – supporting thousands of jobs.

Complex infrastructure projects like railways need careful planning – and work evolves to get the best results.

It's why we're prioritising our construction sequence, to finish a key section between east Birmingham and south Buckinghamshire first.

Our plan is to use the first completed section of the route as our initial test area. Testing the railway is carried out in stages.

First, we thoroughly test the infrastructure. Then we will begin dynamic testing – with the train, track and systems all tested in together.

We need around 50 miles to fully test the railway. This will give us enough space for our high-speed trains to safely accelerate to speeds of over 200 miles per hour, and to have sufficient distance to test the braking systems.

While we are testing the first section, we will safely complete the rest of the
route. Then we’ll begin trial operations.

We are planning for the first passenger services to run between Old Oak Common in west London and Birmingham Curzon Street.

The next stages are to extend HS2 south to London Euston and north – to connect with the existing railway to the North West and Scotland.

Building the railway like this means passengers get better, safer journeys, and the economy grows stronger, as each section opens.

Track our progress and find out how HS2 will benefit your area at hs2.org.uk.

📢 Subscribe for the latest news and updates from Britain’s high-speed railway, HS2.

Follow us on social media:
💼 X: twitter.com/HS2ltd
📸 Instagram: instagram.com/hs2ltd
📘 Facebook: facebook.com/HS2ltd
🔗 LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd

#HS2 #Train #Rail #Infrastructure #Construction #HighSpeedRail #Engineering

Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
📞 Call: 08081 434 434
📧 Email: hs2enquiries@hs2.org.uk
Building a railway | How HS2 will take shapeGiant HS2 box structure in South Warwickshire approaches final phase of construction #shortHS2 Thame Valley Viaduct reaches halfway point #shortsHS2 in West London: from trains to cranes - spotlight on Barratt London
HS2 Ltd |

Building a railway | How HS2 will take shape

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER